Installation/Set-Up Challenges for Polyethylene (PE) Blow Moulded Jerrycans
When using Polyethylene (PE) Blow Moulded Jerrycans, some common installation or setup challenges include:
Leakage: Improper sealing or damage during transportation can lead to leakage issues if not carefully inspected before use.
Threaded Cap Issues: Difficulty in securing or sealing the threaded cap properly can result in leaks and spillage.
Compatibility: Ensuring compatibility with the product to be stored, especially with regard to chemical resistance and suitability for food-grade applications.
Proper Handling: Jerrycans can be heavy when filled, so proper handling and storage procedures are essential to prevent accidents or spills.
Cleaning and Maintenance: Proper cleaning and maintenance procedures are necessary to prevent contamination and ensure product integrity.
Regulatory Compliance: Meeting regulatory requirements for transportation, storage, and handling of hazardous materials in jerrycans.
Storage Conditions: Ensuring proper storage conditions to prevent degradation of the material and maintain the integrity of the jerrycans.
By addressing these challenges through proper handling, maintenance, and adherence to safety protocols, users can maximize the benefits of PE Blow Moulded Jerrycans in various industries.